April 1, 2026

“IN THE MATTER OF THE APPLICATION FOR AUTHORITY TO DEVELOP, OWN AND MAINTAIN DEDICATED POINT-TO-POINT LIMITED FACILITY TO CONNECT THE 62.010MWP / 49.950MWAC AJUY 1 SOLAR POWER PLANT TO THE TRANSMISSION SYSTEM OF NATIONAL GRID CORPORATION OF THE PHILIPPINES (“NGCP”) WITH PRAYER FOR PROVISIONAL AUTHORITY OR INTERIM RELIEF AND MOTION FOR CONFIDENTIAL TREATMENT OF INFORMATION”.